November 21, 2024 10:16 pm

The premier news source for Snohomish County

Pilchuck Park closed Spring and Summer 2023 for construction

Snohomish, Wash., January 24, 2023—Pilchuck Park, located at 169 Cypress Ave in Snohomish, will be closed through the summer of 2023 for construction and maintenance. All baseball fields, sports courts, and the access road will be closed during this time.

The Pilchuck Park access road will be relocated away from the Pilchuck River due to riverbank erosion. During the access road closure, City Parks staff will complete multiple park maintenance projects, including irrigation pump replacement, irrigation system repairs, and sports courts surface improvements. 

Detailed information about the project, including specific closure dates, will be provided this spring after the construction contract is awarded.  

Leave a Reply

Your email address will not be published. Required fields are marked *

Tell Us What You Think

This poll is no longer accepting votes

If you are IAM member, will you vote to approve the October 19 tentative agreement with Boeing? Poll ends 11:59 p.m., Oct 22, 2024.
VoteResults

    Join Our Mailing List

    Verified by MonsterInsights